国产香蕉97碰碰久久人人_欧美日韩无套内射另类_国产精品美女久久久免费_清纯小美女主播流白浆_亚洲国产精品无码一区二区三区

AC source power & DC source power manufacturing factory

Test Application on AC Contactor

AC contactor is a switching device which uses electromagnetic force and spring elastic force to connect and break contacts to control the on-off of load circuit. It is suitable for frequent operation and long-distance control. It is an important component of automatic control circuit system. With the growth of national economic demand and power industry, the demand for AC contactors continues to grow, and competition is increasingly fierce. In order to ensure product quality, the testing of AC contactors is particularly important.

Following will take AC contactor test requirements as an example to introduce AC contactor test scheme in detail.
Before starting the test, we first understand its working principle: when the AC contactor's attraction coil is electrified, the static iron core produces electromagnetic attraction, the armature is absorbed, and the connecting rod connected with the armature drives the contact action, so that the normally closed contacts are disconnected, and the often open contacts are closed, both of them are linked, and the contactor is in the electrified state; When the coil is cut off, the electromagnetic suction disappears, the armature is released under the action of spring, which makes the normally closed contacts closed, the often open contacts disconnected, and the contactor is in a state of power loss.

The client test requirements are as follows: 

1. ON/OFF test: Set ON/OFF AC voltage (rated voltage), starting angle 90 degrees, termination angle 0 degrees, ON/OFF twice, and finally OFF.            
2. Characteristic test: setting voltage (rated voltage), starting angle 30 and termination angle 90 and output ON. Read peak current immediately, delay 500 ms, read and maintain current, maintain power consumption, and finally OFF.           
3. Suction voltage test: first set the suction start voltage (20% of rated voltage), output to ON, then every 200 ms, the voltage rises in accordance with 5V step up to suction, read the suction voltage, and finally output OFF.            
4. Release Voltage Test: First set the release starting voltage (rated voltage), output to ON, set the release voltage (rated voltage 68%) and then every 200 ms, the voltage descends according to 5V step to read the release voltage after release; finally output the OFF.

Among them:
Test requirements 1,2, can be achieved by the panel setting function of ADMIRE POWER standard AC power supply APA1000 series . This function can be set voltage, frequency, starting phase angle and terminating phase angle. The range of setting phase angle is 0-360.

Test requirements 3,4, can be achieved through the ADMIRE POWER standard AC power APA1000 series power supply internal test group, the function can be set up 35 test points to set the starting voltage value, termination voltage value, step voltage value, start frequency, termination frequency and single step time, so that the power supply voltage and time Frequency varies in a step-by-step fashion. If the 35 test points are not enough, the intelligent AC power supply APA2000 series (touch screen display) can provide five test groups, each of which has 35 test points, and each test point can set different voltage, frequency and time.

Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 国产成人一区二区三区影院动漫| 免费无码一区二区三区| 久久中文字幕无码专区| 一本之道高清乱码久久久| 18成禁人视频免费| 亚洲精品卡2卡3卡4卡5卡区| 国产欧美日韩专区发布| 欧美伊人久久大香线蕉综合| 老熟女乱子伦| 成 人免费va视频| 麻豆天美国产一区在线播放| 在线观看精品视频网站| 色噜噜av亚洲色一区二区| 人妻少妇精品中文字幕av| 精品久久久久国产免费| 18以下不能看的色禁网站| 免费午夜爽爽爽www视频十八禁| 亚洲第一页综合图片自拍| 丰满熟女人妻一区二区三| 成人午夜福利视频镇东影视| 久久久久久亚洲av无码精品专口| 67194成在线观看免费| 亚洲五月天综合| 国产国产精品人在线视| 国产日韩精品一区二区三区在线 | 国产一二三四区中| 国产三级无码内射在线看| 三上悠亚久久精品| 色妞ww精品视频7777| 最爽无遮挡行房视频| 丝袜 中出 制服 人妻 美腿| 国产精品久久久久久麻豆一区| 人妻在卧室被老板疯狂进入国产| 中文字幕aⅴ人妻一区二区| 午夜片神马影院福利| 久久99国产精品久久99软件| 肉体暴力强伦轩在线播放| 狠狠色色综合网站| 色狠狠成人综合网| 久久久久久av无码免费看大片| 久久久久国产一区二区三区|